Linda Phone:+86 18059884790      中文版
Product
Product

Contact Us

Contact: YMGK Industrial Control

Phone: +86 18059884790

E-mail: plc66@qq.com

Add: No. 9, 14th Floor, Building 42, Hongshan Lake Road, North Street, Xixiu District, Anshun City, Guizhou Province, China

GE通用
Boards DS200TCPDG1B
  • Warehouse: Spot
  • Warranty: 365 days
  • Quality: Original module
  • Condition: New / Used
  • Shipping method: Courier delivery

  • Contact person: Linda
  • Contact number: +86 18059884790
  • WeChat:18059884790
  • E-mail: plc66@qq.com

Product Description

Product Description

The GE Power Distribution Board DS200TCPDG1B features 8 toggle switches, 36 fuses, and 4 signal wire terminals. It also has 36 OK LEDs and 1 10-pin connector. The OK LEDs are a quick method for the operator to understand if any of the 36 fuses on the board are blown. When the LEDs are lit, it means that the fuses are operational and all circuits on the board are functioning. When the LEDs are off, the fuse is blown and it must be removed and a new fuse must be installed. The board also is populated with 2 red LEDs that indicate that a problem with the board exists and further diagnosing is required to determine the problem.  

DS200TCPDG1B The fuse housings are black plastic and the operator is unable to see the state of the fuse. However, a quick glance at the OK LEDs provide the necessary information. Each fuse has an ID assigned to it. The ID is prefixed with FU followed by a number. For example, one fuse holder has the ID FU1, and another has the ID FU2, and another has the ID FU3.

DS200TCPDG1B The four signal wire terminals are used to connect copper signal wires from other components in the board. To disconnect a signal wire from the terminal, use a screwdriver to loosen the retention screw. Pull the wire out of the terminal and move it to one side. To install a signal wire insert the copper end into the terminal and tighten the retention screw with a screwdriver.

微信图片_20220113111358.jpg



  Why are the prices of many products of our company more competitive?


  (1)Source purchase to reduce the price difference in the intermediate phase


  (2)Stable channel and more guaranteed supply


  Lead time problem


  (1)For the spot products in stock,the delivery can be arranged on the same day after the contract payment is signed


  (2)Order products and deliver according to the quoted delivery date


  Xiamen xiong adheres to the enterprise philosophy of"improving the value of spare parts supply chain",


  For the simple purchase procedure of spare parts,ensure that they are delivered to the site in a timely manner,and help users reduce the risk of downtime caused by the shortage of spare parts


  The emergency spare parts support service is complete,and the user can customize the spare parts.The quality of the spare parts is reliable.All the spare parts provided enjoy a one-year super long warranty


  Spot stock,fast response,reduce user capital investment,improve spare parts utilization,spare parts replacement!


image.png


Related recommendations