Contact Us
Contact: YMGK Industrial Control
Phone: +86 18059884790
E-mail: plc66@qq.com
Add: No. 9, 14th Floor, Building 42, Hongshan Lake Road, North Street, Xixiu District, Anshun City, Guizhou Province, China
- Warehouse: Spot
- Warranty: 365 days
- Quality: Original module
- Condition: New / Used
- Shipping method: Courier delivery
- Contact person: Linda
- Contact number: +86 18059884790
- WeChat:18059884790
- E-mail: plc66@qq.com
P0973LN FOXBORO switch
Although many relays, timers and counters are often used in the ladder diagram program used by PLC, the PLC is not physically equipped with these hardware, but does logic control editing in memory and program programming, and does entity control by connecting external mechanical devices with output components. Therefore, the hardware space required by the controller can be greatly reduced. In fact, the operation mode of PLC stair graph program is to scan the stair graph code into the CPU line by line and then execute the control operation. In the whole scanning process includes three steps, P0973LN "input status check", "program execution", "output status update" is described as follows: PLC first check the input component connected to the point switch or sensor state (1 or 0 represents on or off), and write its state into the memory of the corresponding position Xn. The step graph program line by line into the CPU calculation, if the program execution needs to input the contact state, the CPU directly from the memory to query. The calculation result of the output coil is stored in the corresponding position in the memory and is not reflected to the output end Yn temporarily. Update the output status in Step 2 to the PLC output contact and return to Step 1. These three steps are called the scan cycle of PLC, and the time required to complete is called the reaction time of PLC. If the time of PLC input signal is less than this reaction time, there is the possibility of misreading. After each program execution and before the next program execution, the output and input state will be updated once, so this operation is called the output input end of the program regeneration. The net profit of Baosteel, a big steel company, also reached a record high. This quarter, Baosteel net profit growth to 29.13 billion yuan, performance is very good. P0973LN Baosteel said that this achievement was due to the double growth of steel scale and selling price, which greatly enhanced the company's profitability. At present, the limited production policy of our country did not bring much impact to the iron and steel enterprises, but brought some benefits. So why is this? The increase in steel production in the first half of this year led to a rapid rise in iron ore prices. In May, the price of imported iron ore P0973LN hit a record high of $233 a ton.
More and more
FOXBORO Automation spare parts P0973LN switch, FCP270 P0917YZ, CP40B, FCP270 P0917YZ, ZCP270, FCP280, P92, P0961FX-CP60S, CP60, P0911SM, P0960JA-CP40, 873EC-JIPFGZ-5, P0961CA, H92, CP30...