Contact Us
Contact: YMGK Industrial Control
Phone: +86 18059884790
E-mail: plc66@qq.com
Add: No. 9, 14th Floor, Building 42, Hongshan Lake Road, North Street, Xixiu District, Anshun City, Guizhou Province, China
- Warehouse: Spot
- Warranty: 365 days
- Quality: Original module
- Condition: New / Used
- Shipping method: Courier delivery
- Contact person: Linda
- Contact number: +86 18059884790
- WeChat:18059884790
- E-mail: plc66@qq.com
Product Description
The GE Cell State Sensor Board DS200CSSAG1B contains two 40-pin connectors and is 4 inches in height and 11 inches in width. It also contains one 4-pin connector and one 9-pin connector. The GE Cell State Sensor Board DS200CSSAG1B can only be installed with the power removed from the drive and one of the first steps in the replacement procedure is to shut off the power. That removes the danger of electric shock and burn from injuring the installers as well as damaging the board and all components.
However, before you proceed it is also necessary to use a testing device to verify that the power is removed. There are some general guidelines to follow concerning the testing device. Make sure the controls on the device are set correctly for the task and also ensure that the tester is calibrated accurately. Only use the approved probes for the tester and inspect them to make sure they are in good working condition.
You must have full knowledge of the drive and understand how to test the drive for the presence of electrical power. Once you are satisfied of the absence of power, you can start the procedure. Start by viewing the old board and examining the cables attached to it. Use tape or other means to place labels on the cables that identify the connectors the cables are attached to. Use a screwdriver to remove the screws that secure the board in the drive. Keep the screws and nylon washers out of the way in a safe place.