Linda Phone:+86 18059884790      中文版
Product
Product

Contact Us

Contact: YMGK Industrial Control

Phone: +86 18059884790

E-mail: plc66@qq.com

Add: No. 9, 14th Floor, Building 42, Hongshan Lake Road, North Street, Xixiu District, Anshun City, Guizhou Province, China

GE通用
DS200IMCPG1CGC
  • Warehouse: Spot
  • Warranty: 365 days
  • Quality: Original module
  • Condition: New / Used
  • Shipping method: Courier delivery

  • Contact person: Linda
  • Contact number: +86 18059884790
  • WeChat:18059884790
  • E-mail: plc66@qq.com

Product Description

DS200IMCPG1CGC Technical Specifications

ManufacturerGE General Electric
SeriesMark V
Part NumberDS200IMCPG1CGC
Product TypeIGBT Power Supply Board

微信图片_20220113111332.png

Product Description

The GE IAC2000I Power Supply Interface Board DS200IMCPG1CGC can be connected through a cable to the DS200SDCC Drive Control Board. Connect the cable to the 1PL connector on the Drive Control Board. Before you open the box in which the board is shipped to you, follow a few guidelines to ensure you have the board you ordered and that the board arrives in good condition.

1-230325102111524.jpg

Examine the box for signs of unacceptable handling during shipment. Look for evidence that liquid spilled on the box and evidence that the box has been dented or stepped on. If the box appears to be in good condition after the visual inspection, locate the shipping label on the box.  Make sure the model number is the same as the model you ordered and also write down the other identifying information on the label. You will find the serial number, catalog number and other identifiers. If you ever have a reason to call for service, you can speed the response time by providing to service the exact board you are calling about.

If you don’t have a need to install the board immediately, put it in a safe place that is accessible only to those who need use to it. When you are ready to install it, open the box and observe that the board is stored in a protective bag. Hold the board by the edges only and remove the board and place it immediately on the empty bag.


Related recommendations